How to stack ductile iron pipes reasonably

After the ductile iron pipe is produced or transported to a certain place, it needs to be stacked accordingly so that it does not take up too much space. Although its performance is relatively good, but also pay attention to the stacking method and method, on the one hand to ensure its quality problems, on the other hand to ensure safety. Let's take a look at the correct stacking method of the pipe fittings together!

Ductile iron pipe stacking

1. At the beginning of stacking, it should be stable. Under the condition of ensuring safety, stacking should be based on the variety and specifications to prevent confusion and mutual corrosion.

2. The bottom of the ductile iron pipe stack should be high, firm and flat to prevent the material from being damp or deformed. If the warehouse is a sunny cement floor, it can be raised by 0.1m; if it is muddy, it must be raised by 0.2~0.5m. If it is an open field, the cement floor should be raised by 0•3~0.5m, and the sand and mud surface should be raised by 0.5~0.7m.

3. Do not store items that are corrosive to steel near the stacking position, otherwise the pipe fittings will be corroded.

4. Stack height requirements: manual operation does not exceed 1.2m, mechanical operation does not exceed 1.5m, and stack width does not exceed 2.5m.

5. For section steel stacked in the open, there must be wooden mats or stones underneath, and the stacking surface should be slightly inclined to facilitate drainage. Pay attention to the materials to be placed flat and straight to prevent bending and deformation. Angle steel and channel steel should be stacked in the open air, that is, the mouth should be facing down, the I-beam should be placed upright, the I-slot surface of the steel should not be facing upwards, and nodular cast iron pipes should be used to prevent water from rusting.

In addition, after ensuring the above stacking methods, it should be noted that there should be a certain passage between the ductile iron pipe stacks and the stacks. The inspection channel is generally 0.5m. The access channel depends on the size of the material and the transportation machinery. 1.5~2.0m. This is to better ensure the safety of palletizing. 
与此原文有关的更多信息要查看其他翻译信息,您必须输入相应原文

 
 Shandong Gaomi Marriott Machinery Co., Ltd

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China 

Contact: Manager Guo Mobile: 13646362678 URL:wanhaojixie.cn

Tel: 0536-2757298  技术支持:企化网络 鲁ICP备16040285号-1

主站蜘蛛池模板: 新泰市| 贺兰县| 贵阳市| 浦城县| 隆林| 临城县| 海盐县| 尚义县| 合江县| 绥江县| 鹤峰县| 方山县| 三门峡市| 琼结县| 肇州县| 牙克石市| 鄂托克旗| 嘉义县| 靖边县| 永顺县| 亳州市| 旅游| 女性| 内黄县| 长沙县| 金塔县| 浑源县| 金坛市| 余姚市| 南溪县| 修武县| 浦东新区| 乌海市| 旬阳县| 北海市| 罗山县| 乃东县| 兰溪市| 宁强县| 两当县| 陇西县|