Summary of construction experience of ductile iron pipe fittings

No matter which industry you are in, over time, you will always accumulate some relevant experience in these industries. The same is true for the construction of ductile iron pipe fittings. The staff have been working in this post for a long time and have an understanding of its construction requirements and precautions. Let's take a look at the summary of their construction experience, which is as follows:

Construction of ductile iron pipe fittings

1. If the construction is in summer, vegetable oil should be used as the lubricating oil, and the joints can be covered with soil. If it is a cold winter, the rubber ring can be preheated with hot water. The purpose of this is to reduce the hardness to ensure rapid installation.

2. Before installation, the rubber ring can be soaked with water to better complete the installation work.

3. If you need to borrow the pipe during installation, if the rotation angle of the pipe itself cannot be satisfied, you can borrow the rotation angle according to the required angle. After calculation, cut the pipe socket and oblique the opening, which can increase the borrow rotation. Angle, and can ensure safe use.

4. If there is no condition to test the pressure with water, you can also consider using air to test the pressure.

5. Three links and elbows must be made of concrete buttresses. The trench backfill should be compacted in layers. If the pipeline crosses the road, in order to avoid crushing the pipe body, coarse sand can be backfilled to the top of the pipe.

6. In order to avoid the phenomenon of interface dripping during construction. During installation, the construction should be carried out in strict accordance with the specifications, and each pipe should be installed in place. For large-diameter pipes, the condition of each joint apron should be checked.

In fact, there are many points that need to be paid attention to during construction. Here is a brief introduction to some frequently encountered problems that need to be paid attention to during construction. The above information is a summary of the construction experience of ductile iron pipe fittings. I hope it will be helpful to you during your operation! 
与此原文有关的更多信息要查看其他翻译信息,您必须输入相应原文

 
 Shandong Gaomi Marriott Machinery Co., Ltd

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China 

Contact: Manager Guo Mobile: 13646362678 URL:wanhaojixie.cn

Tel: 0536-2757298  技术支持:企化网络 鲁ICP备16040285号-1

主站蜘蛛池模板: 信阳市| 轮台县| 清徐县| 邢台县| 济宁市| 类乌齐县| 原阳县| 汉中市| 扬中市| 山西省| 凤阳县| 海晏县| 平陆县| 清河县| 如东县| 顺义区| 郧西县| 泰州市| 沾化县| 漳州市| 喀什市| 津市市| 梨树县| 镇康县| 杭锦旗| 云浮市| 大英县| 临夏市| 盐源县| 道孚县| 天柱县| 安乡县| 抚州市| 白水县| 柳州市| 南召县| 罗江县| 江华| 富平县| 枣强县| 克什克腾旗|